Catalog reference
The supplied catalog supports juice or tea preparation, optional homogenization and deaeration, heat treatment, hot filling and cooling as connected references.
Keep the particle definition visible
A juice with pulp bottling line must carry a defined particle-bearing product through preparation, transfer, heat treatment, filling and cooling without pretending that one pulp description or filler design fits every recipe.
Answer first
Particle size, shape, concentration, settling behavior and the liquid phase can change mixing, filtration, pumping, pipework, heat transfer and filling. The project should define the actual pulp and product, confirm whether homogenization is appropriate or intentionally avoided, establish the validated thermal and filling route, and prove container, closure and cooling compatibility. Samples and tests may be required before final equipment selection.
01 / Product evidence
Words such as pulpy or chunky do not define an equipment duty. Provide representative product, particle dimensions and distribution, concentration, viscosity or flow behavior, and any sensitivity to shear or holding.
02 / Process continuity
Agitation, outlet geometry, pumps, valves, pipe diameters, heat exchanger selection and buffer time must be reviewed as one product path. A compatible filler cannot repair particle damage or separation created upstream.
03 / Fill and pack
The filler must handle the confirmed liquid and particle phase at the required condition, while the container and closure must support the selected process. Inversion and cooling, when applicable, remain project-specific operations.
Particle-handling brief
The same particle evidence should follow the product from preparation to the sealed pack.
| Interface | Required input | Why it matters |
|---|---|---|
| Preparation tank | Particle loading and suspension behavior | Agitation and outlet design must maintain the intended product |
| Transfer | Particle size, shear sensitivity and settling | Pump, valve and piping route may change |
| Heat process | Product rheology and particle distribution | Heating, holding and verification approach may change |
| Filling | Passage, fill condition and container opening | Product delivery and fill consistency depend on the interface |
| Cleaning | Soil, retention points and circuit boundary | CIP coverage and inspection access must be defined |
Evidence boundary
Evidence labels keep a reference architecture separate from a final design or commercial promise.
The supplied catalog supports juice or tea preparation, optional homogenization and deaeration, heat treatment, hot filling and cooling as connected references.
Particle-bearing products require a continuous passage and product-quality review across every contact module.
Final process, particle range, equipment, output and cleanability require samples, approved data and signed documents.
Buyer questions
These are planning answers. Final process and equipment choices require a confirmed project brief.
Do not assume so. The product sample, particle range, concentration, filler passage, valve concept and container opening must be reviewed before a model is selected.
No. Homogenization changes product structure and may be unsuitable when visible pulp must remain. The recipe objective and process trials should decide.
A percentage is not enough. Particle dimensions, shape, distribution, liquid phase, settling, process condition, package and output basis are also needed.
Catalog reference The supplied 2026 catalog supports the named CSD and juice/tea equipment chains and is the source for the redrawn functional routes.
Engineering principle Interface explanations show why product, process, package, utilities and line balance must be reviewed together.
Project confirmation The routes are not a final process design, P&ID, validated cycle, quotation, availability statement or performance guarantee. Signed project documents define the final scope.
Allot Tech project desk
For a useful first reply, send the beverage, package, target good output and factory. If a line is already operating, add the observed symptom, first-known-good and first-known-bad time, affected SKU, photos, alarms and available production data.
Company verification: visit allottech.com.