Controlled duty
Assess distribution, heat loss, residence and valve feed around the carousel at speed, low level and short stop. The project record must connect bowl or manifold geometry with inlet flow and temperature condition, define the thermal operating envelope and assign the package-release decision.
- Bowl or manifold geometry
- Inlet flow and temperature condition
- Required result and acceptable operating range