Controlled duty
Define valve warm-up, minimum product condition, position monitoring and diversion through startup, stop and restart. The project record must connect valve construction and thermal mass with startup and idle duration classes, define the thermal operating envelope and assign the package-release decision.
- Valve construction and thermal mass
- Startup and idle duration classes
- Required result and acceptable operating range