01 / Search intent answered
Turn the question into a controlled engineering duty
Coordinate tunnel and upstream safe states when dried, inspected, labeled or packed containers cannot leave. The project record must connect downstream block location and capacity with tunnel discharge accumulation, define the thermal operating envelope and assign package-disposition ownership. Use incoming product and package temperature, required thermal or surface endpoint, package material and internal pressure, line rate and spacing, ambient range, zone-water quality, available heat and cooling, drainage and product-quality limits. State credible gaps, stops, restarts, low load, blocked discharge and sanitation states. Record every input with units, source, approval status, credible range and decision owner. Keep an unknown visible when it can change sizing, hygiene, packaging, automation, utilities, cost or schedule.