01 / Search intent answered
Turn the question into a controlled engineering duty
Define checks for mouth, finish, body, base, foreign material and wrong bottle with qualified defect samples. The project record must connect defect library and severity classification with glass color and surface variation, define the glass-package operating envelope and assign release ownership. Use approved bottle and finish drawings, glass color and mass, supplier defect limits, product and filling condition, internal pressure or vacuum, closure and label route, thermal shock, pack pattern and distribution. State pallet quality, inspection defect library, rinse decision, breakage zoning, line-cleaning response and material change control. Record every input with units, source, approval status, credible range and decision owner. Keep an unknown visible when it can change sizing, hygiene, packaging, automation, utilities, cost or schedule.