04 / Acceptance and handover
Prove the result under a representative production condition
Review risk before implementation, define testing or revalidation and update settings, records, training and release documents. Retain measured evidence for change description and affected route and document and production-release update with method, position, limit, deviation, witness, approval and requalification trigger. Map product and package temperature by time and position with calibrated measurements, challenge line stops and thermal disturbances, verify closure contact, container dimensions, vacuum or pressure, seal integrity and product quality, and retain approved deviation and release decisions. Put the sample or test material, method, instrument, production state, duration, limit, witnesses, retained record and deviation authority in the protocol before testing begins. Requalify when a product, package, site, speed or connected system invalidates the accepted basis.