Controlled duty
Define final bottle temperature, moisture, deformation and surface cleanliness before label or sleeve application. The project record must connect container surface and geometry tolerance with cooling discharge temperature, define the thermal operating envelope and assign the package-release decision.
- Container surface and geometry tolerance
- Cooling discharge temperature
- Required result and acceptable operating range