Controlled duty
Map heater, holding, buffer, filler and return circuits around product soil, fouling, hydraulics and rinse release. The project record must connect worst-case product and heat soil with circuit geometry and flow balance, define the thermal operating envelope and assign the package-release decision.
- Worst-case product and heat soil
- Circuit geometry and flow balance
- Required result and acceptable operating range