01 / Search intent answered
Turn the question into a controlled engineering duty
Set stages, pressure, temperature, flow and process location from fat globule, cocoa, mouthfeel and stability targets. The acceptance basis must resolve fat, protein and particle inlet state together with mouthfeel and stability objective, then assign operating limits, responsible roles and controlled records for this exact task. Control dairy-base identity and microbiological quality, fat and solids targets, added powders or flavors, allergen segregation, thermal process, storage claim, package barrier, production schedule and sanitation rules. Record receiving release timing, milk age and temperature, component mass-balance methods, protein and particle stability, thermal worst case, post-process hygiene or sterile boundary, cold-chain case and cleaning validation before committing production capacity. Record every input with units, source, approval status, credible range and decision owner. Keep an unknown visible when it can change sizing, hygiene, packaging, automation, utilities, cost or schedule.