Observed decision problem
Thin or damaged walls, weak base or finish, excessive internal pressure, stress cracking, over-carbonation, high temperature or impacts can produce a burst. Follow the disturbance upstream and downstream through preparation, treatment, buffer, filler, closure, inspection, conveyors, packing and utilities. Synchronize clocks and include starts, short stops, speed changes, material replenishment, cleaning, maintenance and operator interventions. Review startup, steady production, short stops, restart, low or high demand, format or recipe change, cleaning and shutdown. The interface must protect both the incoming condition and the requirement of the next module.