Controlled duty
Design drainage, slope, traps, cleaning and dew-point management to keep water and aerosols away from exposed packages. The project record must connect room dew point and cold-surface map with drain location and hydraulic load, define the hygienic operating envelope and assign product-release ownership.
- Room dew point and cold-surface map
- Drain location and hydraulic load
- Required result and acceptable operating range