01 / Search intent answered
Turn the question into a controlled engineering duty
Define closure defects, reject timing, confirmation, secure bins, counters and controls preventing rejected packages rejoining released flow. The project record must connect closure defect classes and sources with sensor-to-reject package timing, define the component operating envelope and assign package-release ownership. Control cap, crown, end, foil, plug or seal drawings and materials, liner or coating, component lots and tolerances, container finish, product chemistry, filling and thermal history, tamper evidence, opening target and recycling duties. State feeding orientation, treatment if required, application method, destructive and nondestructive tests, sampling and supplier change notification. Record every input with units, source, approval status, credible range and decision owner. Keep an unknown visible when it can change sizing, hygiene, packaging, automation, utilities, cost or schedule.