Controlled duty
Execute installed water and representative-product hydraulic, thermal, residence, diversion, pressure, aseptic, utility, fouling, cleaning and operating-state evidence under the approved process-authority and validation plan. The review must also reconcile approved process-authority and validation protocol with as-built equipment and calibrated instruments across normal, transition and fault conditions.
- Approved process-authority and validation protocol
- As-built equipment and calibrated instruments
- Required result and acceptable operating range