Catalog reference
The supplied catalog identifies connected preparation, filling, treatment and packing modules whose losses can interact at line level.
Availability × performance × quality
Beverage-line OEE becomes useful only after the measurement boundary, reference SKU, planned production time, ideal rate and definition of a good finished pack are fixed. Otherwise one percentage can hide very different losses.
Answer first
Define the complete-line boundary and one reference product and pack, then calculate availability, performance and quality from the same time window. Keep the underlying event record: changeovers, cleaning, failures, starved or blocked machines, micro-stops, reduced speed and rejects. OEE is the product of the three factors, but the loss tree explains what should actually be improved.
01 / Measurement contract
State where the measured line begins and ends, which SKU and pack pattern define the ideal rate, which time is scheduled for production and what counts as an accepted finished unit. Machine OEE and complete-line OEE are not interchangeable.
02 / Loss record
A line can lose output through long stops, repeated short stops, slow running, product starvation, downstream blocking or rejects. Capture the cause, duration, affected module and operating condition instead of assigning every stop to the filler.
03 / Improvement proof
Prioritize the largest repeatable loss, change one interface and compare the same measurement window again. Confirm that faster running has not increased rejects, product loss, unsafe work or repeated downstream blocking.
Transparent OEE worksheet
Use one line boundary and one reference condition. The result is only as comparable as the definitions entered.
Availability87.5%
Performance89.3%
Quality99.0%
OEE77.3%
Formula: availability × performance × quality. Validate the time boundary, ideal rate, count point and good-pack rule before comparing shifts or suppliers.
OEE measurement contract
The calculator below is a transparent worksheet, not a performance guarantee or universal benchmark.
| Field | Definition to record | Common distortion |
|---|---|---|
| Boundary | First included module to accepted discharge | Mixing machine and line-level results |
| Planned time | Agreed scheduled production window | Removing losses after the event |
| Ideal rate | Reference SKU and pack condition | Using a different denominator by shift |
| Total count | Units crossing the agreed count point | Double counting rework or recirculation |
| Good count | Accepted saleable units at the boundary | Ignoring downstream rejects |
Evidence boundary
Evidence labels keep a reference architecture separate from a final design or commercial promise.
The supplied catalog identifies connected preparation, filling, treatment and packing modules whose losses can interact at line level.
OEE is organized as availability, performance and quality under one documented line boundary and reference condition.
Targets, event categories, data sources and acceptance use require agreement with the operating site.
Buyer questions
These are planning answers. Final process and equipment choices require a confirmed project brief.
No. OEE is a normalized effectiveness measure. Sellable output also depends on scheduled time, SKU plan, batch supply, planned cleaning and the selected measurement boundary.
Only when the agreed reference product, package and line boundary support that basis. Use one documented ideal rate rather than changing the denominator to improve the result.
The site must define the planned-time rule consistently. Keep changeover duration visible even when it is reported separately, because SKU and format strategy affect usable output.
Catalog reference The supplied 2026 catalog supports the named CSD and juice/tea equipment chains and is the source for the redrawn functional routes.
Engineering principle Interface explanations show why product, process, package, utilities and line balance must be reviewed together.
Project confirmation The routes are not a final process design, P&ID, validated cycle, quotation, availability statement or performance guarantee. Signed project documents define the final scope.
Allot Tech project desk
For a useful first reply, send the beverage, package, target good output and factory. If a line is already operating, add the observed symptom, first-known-good and first-known-bad time, affected SKU, photos, alarms and available production data.
Company verification: visit allottech.com.