Controlled duty
Engineer lifting, frame rating, liner connection, massage or agitation, discharge valve, dust containment, earthing, operator access and controlled feed from each approved FIBC construction. The review must also reconcile fIBC dimensions, spout and liner details with maximum suspended load and lifting method across normal, transition and fault conditions.
- FIBC dimensions, spout and liner details
- Maximum suspended load and lifting method
- Required result and acceptable operating range