01 / Search intent answered
Turn the question into a controlled engineering duty
Define symbol, size, quiet zone, color, position, print and verification grade for the intended scanning environment. The project record must connect identifier and gs1 data structure with symbol, size and package placement, define the decoration operating envelope and assign identity-release ownership. Use container drawings and tolerances, surface temperature and moisture, label or sleeve construction, inks and adhesives, approved artwork and languages, required variable data, code grade or readability method, line speed and pack contact, recycling objective and format schedule. Define master-data ownership, line clearance, material reconciliation and release authority. Record every input with units, source, approval status, credible range and decision owner. Keep an unknown visible when it can change sizing, hygiene, packaging, automation, utilities, cost or schedule.